Windows, Wiring, Siding

Over the past month, we’ve had the roof, windows/doors, garage floor, wiring/electrical, plumbing, and most of the siding added.
IMG_4970
 
Our outdoor room is starting to shape up with the fireplace being installed.  I was hesitant about the loss of interior square footage due to the outdoor room but I have to say that as it comes together, it’s becoming one of my most liked features of the house.
IMG_4965IMG_4963IMG_4956
 
As the electrical and plumbing work wraps up, the next steps will be to finish the siding and putting up the drywall.  Our move day is still planned for late October; we’re right on schedule.
IMG_4957IMG_4951IMG_4952